July 19 2008 - Equipment move, part 2.
The Museum had another three pieces of equipment brought to the site today.
The Museum would like to again thank A&B Rail for their assistance with this move.

The Museum's Autobox and Ore car were loaded first.

The Ore car was unloaded at the museum and we went back for the two bay Coal car.
[Above left] Loading of the Museums two bay Coal car. [Above right] The last two cars are brought to the Museum.
[Above right and below left] Unloading at the Museum. [Below right] The Museum's tractor was used to push the cars together.
Below is a video of the unloading of the Museum's Autobox.
[Below] At the end of the day the Museum's freight line is set up.